Kopuaroa Inclined Drains

Client

Transport Rebuild East Coast (TREC)

Location

Kopuaroa, north of Tokomaru Bay

Year

2026

Contract value

​

Rock Control drilled inclined drains up to 100 metres long at Kopuaroa, north of Tokomaru Bay, as part of the Transport Rebuild East Coast programme.

 

Inclined drains are drilled up into a slope to intercept groundwater and let it out. Lowering the water pressure inside the ground improves the stability of the whole slope. Drain drilling is one of the less well known parts of Rock Control's drilling work.

 

Two drill rigs worked at once, including the Hütte 605, to keep the project on programme.

 

The drilling slurry was managed on site. Each drilling area was contained with large silt socks, and a treatment turned the slurry into a gel that could be handled. Soil was mixed through before the material was loaded out, which kept the operation controlled and limited its effect on the surrounding environment.

​

​

​