Kaikōura Tunnel Portals Slope
Client
KiwiRail
Location
Main North Line, south of Kaikōura
Year
2025 - 2026
Contract value
$2.5 million
Rock Control delivered the MNL 175–179km Tunnel Portals Slope Treatment project for KiwiRail on the Main North Line south of Kaikōura, with works starting in late November 2025 and finishing at the end of July 2026.
The project involved stabilising approximately 9,400m² of steep, earthquake-affected slopes above and between railway tunnels. Rock Control removed over 8,000m³ of vegetation and loose material and installed 513 permanent anchors and anchored MacMat erosion control mesh to improve long-term slope stability and encourage natural revegetation.
For Rock Control, the project was a significant achievement as one of its largest projects delivered as a head contractor, building on the company's experience as a specialist geotechnical subcontractor. The project also provided opportunities to employ and develop local Kaikōura workers while strengthening the leadership capability of the wider Rock Control team.
The works were completed alongside live rail operations and during a particularly wet period, with major weather events triggering further slope movement and additional stabilisation requirements. Rock Control worked closely with KiwiRail and its engineering team to respond to these changing conditions and deliver the additional works while maintaining project momentum.
Despite the additional works and challenging conditions, the project was completed under budget and to a high standard, with no defects or rework required.
Rock Control delivered an excellent outcome on the MNL Tunnel Portals project and exceeded expectations in several areas. Their strong technical expertise, proactive communication, and ability to efficiently manage additional works and project challenges were key contributors to the successful delivery of the project.